Data centre migration services

A data centre migration is the planned relocation of racks, servers, storage and network equipment from one facility to another. DataOptix audits the estate, builds a dependency-aware move sequence, decommissions and transports the hardware, then reinstalls, cables and verifies it at the destination. The point of the plan is that every wave has a rollback and nothing moves before its dependencies do.

An equipment trolley loaded with servers being moved along a data centre corridor

What's included

What data centre migrations covers

Every engagement is scoped to your site and your build standard. This is what the work typically involves.

  • Pre-move audit of assets, cabling and dependencies
  • Move-group sequencing with rollback points per wave
  • Labelling and photographic capture before decommissioning
  • Safe decommissioning, packing and insured transport
  • Reinstallation to the destination elevation
  • Cabling, patching and cross-connect turn-up at the new site
  • Power-on verification and application-level smoke testing
  • Decommissioning of the source racks and space handback

How it works

From request to sign-off

  1. Step 1: Audit and plan

    We record what is installed, how it is cabled and what depends on what, then agree move groups and the rollback point for each wave.

  2. Step 2: Move in waves

    Each wave is decommissioned, photographed, transported and reinstalled inside its change window, with the rollback available until sign-off.

  3. Step 3: Verify and hand back

    Equipment is powered on, reachability confirmed and smoke tests run with your team before the source space is decommissioned and handed back.

Response

SLA options

Pay as you go carries a 4-hour response SLA. Block-hour customers are dispatched on 2-hour and take priority over ad-hoc requests.

Pay as you go

4-hour response

Occasional, unplanned work with no ongoing commitment

Block hours

Most popular

2-hour response

Regular work, or uptime requirements that need faster response

Project-based

Scoped per project

Migrations, new builds, audits and cabling programmes

Compare the service models in full

Data centre migrations questions

How much downtime does a migration need?

It depends on how much of the estate is resilient. Services running active-active across two sites can often move with no downtime at all, while a single-instance database needs a window sized to the shutdown, transport and start-up time. The audit is what turns this into a real number.

Do you handle the transport as well?

Yes. We arrange insured, shock-monitored transport appropriate to the equipment and distance, and our engineers accompany the load between sites.

What happens if something fails to come back up?

Every wave carries a rollback point that stays available until you sign the wave off. If a device does not return to service we work the fault at the destination and, if it cannot be resolved in the window, restore the wave to its previous state.

Can you migrate between providers rather than between halls?

Yes. Cross-provider and cross-border moves are common work for us. The extra planning goes into cross-connect provisioning and carrier lead times at the destination, which we start well before the move date.